Drain on Jalan Tebet Timur IV Dredged
access_time September 29 2020 06:11 PM remove_red_eye 1111
Reported by TP Moan Simanjuntak | Translated by Nugroho Adibrata
Reported by TP Moan Simanjuntak | Translated by Nugroho Adibrata
It is conducted to smoothen water flow in the drain when it rains
Ten PPSU officers assisted by five officers from Tebet Sub-district Water Resources (SDA) Taskforce are sent to dredging up clogged waste and mud in the drain alongside Jalan Timur IV, RW 08, Tebet Timur Urban Village.
Tebet Timur Urban Village Head Siti Fauziah Ghozali said the drain itself had 1 meter wide with 25 centimeters deep.
Personnel Finish Mud Dredging Work on Jl. Kalisari 3 Water Channel"It is conducted to smoothen water flow in the drain when it rains," she expressed, Tuesday (9/29).
She added a big-size truck also deployed to transport waste and mud at the location.
"Hopefully the surrounding environment can be free of flooding," she hoped.